标题: 浅谈 3030t/h 超超临界锅炉燃烧系统调试 [打印本页] 作者: mthmh 时间: 2009-7-28 08:25 标题: 浅谈 3030t/h 超超临界锅炉燃烧系统调试 <p align="center"><font face="Verdana">浅谈 3030t/h 超超临界锅炉燃烧系统调试 <br/>张文鹏 米荣华 牛先印 尹民权 华电国际邹县发电厂 山东邹城 273522 <br/>On 3030t / h Ultra-supercritical boiler combustion system debugging <br/>Zhangwenpeng Mironghua Niuxianyin Yinminquan Zouxian power plant in Shandong Zoucheng City, Shandong <br/> </font></p><font face="Verdana">
<p><br/>摘 要: 简要介绍 3030t/h锅炉的燃烧器特性及工作原理,针对#7锅炉燃烧器投产试运中的工况,结合同类锅炉燃烧器运行、检修中发生的问题,提出今后运行及检修工作中注意事项。 <br/>关键词:锅炉燃烧器 特性及工作原理 利用注意事项 <br/>Abstract : This paper describes 3030t / h boiler burner characteristics and working principle against # 7 Burner commissioning trials of working conditions, similar combination boiler burner operation, maintenance of the problem, proposed that the future operation and maintenance work for the attention. <br/>Keywords : boiler burner characteristics and working principle for the use of attention </p>