1000MW 超超临界锅炉结焦的原因及对策

[复制链接]
跳转到指定楼层
1#
mthmh 发表于 2009-7-29 16:08:30 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
<p align="center"><font face="Verdana">1000MW 超超临界锅炉结焦的原因及对策 <br/>张东民 <br/>山东省邹城市邹县电厂,山东邹县&nbsp; 273522 <br/>The Reasons And Solutions Of The Slag Buildup In The 1000MW Over-Supercritical Boiler <br/>ZHANG Dong-min <br/>Zouxian Power Plant,Zoucheng City,Shandong Province&nbsp; 273522 </font></p><font face="Verdana">
<p><br/>摘&nbsp; 要:本文简要介绍了邹县电厂1000MW超超临界锅炉的结构及燃用的煤种,对出现结焦现象的原因从燃煤特性、锅炉设计特性、水冷壁粘污、结焦位置等方面进行了分析。阐述了1000MW超超临界锅炉在采用较大的炉膛容积、燃烧器布置、燃烧器热功率、炉膛易结焦区域布置吹灰器等设计方面防止受热面结焦的经验。总结了1000MW超超临界锅炉判断结焦的经验。从进一步确认锅炉结焦部位、加强炉膛吹灰、消除炉膛漏风、合理调整运行方式、保证锅炉负压运行、控制煤粉细度、保持相对高氧量运行等方面提出了防止结焦的对策。 <br/>关键词:结焦;原因;对策 <br/>Abstract: This paper introduces the Zouxian&nbsp; Power Plant 1000 MW Ultra-supercritical boiler structure and coal-fired, and discusses the reasons of slag buildup in&nbsp; several ways such as the coal-fired, boiler design features, the water wall sewage and coking locations in an analysis. On the 1000 MW Ultra-supercritical boiler furnace&nbsp; in the larger volume, burner layout, burner thermal power and coking regional furnace-soot blowing layout design. Summed&nbsp; up the 1000 MW Ultra-supercritical boiler preventing heating surface coking experience. Further confirmation on the boiler coking locations, strengthen the furnace soot blowing, elimination of the furnace air leakage, adjust the&nbsp; operation, ensure boiler negative-pressure operation, control the fineness of pulverized coal, remained relatively high oxygen, and other aspects of the operation to prevent coking response. <br/>Key words: The Slag Buildup, Reason, Solution </font></p> QyrA2NON.pdf (199.37 KB, 下载次数: 3) <br/>
分享到:  QQ好友和群QQ好友和群 QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
收藏收藏
您需要登录后才可以回帖 登录 | 注册

本版积分规则

池作和-具有超强防结渣性能纳米陶瓷涂层

Archiver|手机版|小黑屋|中国电力科技网 ( 鲁ICP备09062776号  

GMT+8, 2024-4-25 21:09

Powered by Discuz! X3.2

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表