<p align="center"><font face="Verdana">邹县四期工程水处理系统设计优化 <br/>袁萍帆 穆冬梅 西北电力设计院 <br/>Water Treatment System Design OptimiZation in the 4th Phase of Zouxian Power Plant <br/> Yuan Pingfan, Mu Dongmei (Northwest Power Design Institute, Shaanxi) <br/> </font></p><font face="Verdana">
<p><br/>摘 要:本文重点针对邹县电厂四期工程 2×1000MW 机组凝结水处理设备配置及设计优化情况进行了介绍,并对化水专业热力系统加药、水汽取样及锅炉补给水处理系统设计要点作一简介。 <br/>关键词:邹县四期 ; 水处理 ; 设计 ; 优化 <br/>Abstract: This paper introduces the facility disposition and design optimization in condensate polishing system, and also indicates the key point of chemical dosing system, water & steam sampling system, feed water treatment system design in zouxian power plant 4th phase 2×1000MW units project. <br/>Key words: zouxianpower plant 4th phase water treatment design optimization; </p>