<p align="center"><font face="Verdana">日立1000MW 级超超临界汽轮机低压通流故障原因分析 <br/>李祥苓,何新江,李旭涛,李 萍,张庆国 <br/>华电国际邹县发电厂,山东邹城 273500 <br/>Analyze on Hitachi 1000MW USC turbine LP flow path deficiency <br/>LI Xiang-ling, HE Xin-jiang, LI Xu-tao, LI Ping, ZHANG Qing-guo <br/>huadian international zouxian power plant&nbsp;</font></p><font face="Verdana">
<p><br/>&nbsp;摘 要:邹县电厂1000MW汽轮发电机组在第一次检查性大修中发现低压通流发生严重的汽水腐蚀现象,通过对低压通流制造材质和工况的分析,对比我厂现有制造材质等级相同亚临界机组日立-东方联合设计制造的 600MW 汽轮机低压通流的工况,查找在亚临界机组未出现的故障出现在超超临界机组低压通流的原因,并针对故障原因提出了提高给水品质、严格机组启动前的给水系统清扫标准,从故障源头上排除造成故障的诱因,并对该型机组新汽轮机低压通流的设计制造提出了采用更高等级抗腐蚀材料的建议,确保了机组安全,为同类型机组的设计制造和安全生产,提供了宝贵经验。 <br/>关键词:1000MW超超临界机组;低压通流;腐蚀;措施 <br/>Abstract: The serious corrosive was found on LP foreside stages during the first inspection overhaul of 10000MW turbine in Zouxian power plant. The LP flow path working conditions of USC and sub-critical turbine was compared and analysis was made on the materials and working condition to find the reason why the same deficiency was not found in sub-critical turbines that use similar manufacture material. And series measures, such as feed-water quality promotion and enough system flushing before unit start, were taken to prevent the deficiency happen again. Suggestions were given that the better corrosive-resisted material should be used during the LP flow path of this type USC turbine design and manufacture. All these measures and suggestions assure the safe and stable operation of the same type turbine. <br/>Key words: USC pressure turbine 1000MW, LP flow fath, corrosive, measure </font></p> 02ZL8VQa.pdf (164.47 KB, 下载次数: 9) <br/>
分享到:  QQ好友和群QQ好友和群 QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
收藏收藏
您需要登录后才可以回帖 登录 | 注册

本版积分规则

鲁能软件-供热机组节能环保诊断平台

Archiver|手机版|小黑屋|中国电力科技网 ( 鲁ICP备09062776号  

GMT+8, 2024-4-27 00:06

Powered by Discuz! X3.2

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表